Asia-Pacific Data Center - Market Share Analysis, Industry Trends & Statistics, Growth Forecasts (2027 - 2032)
Asia-Pacific Data Center Market Analysis According to Mordor Intelligence, the Asia-Pacific data center market size is expected to grow from USD 35.77 billion in 2026 to USD 43.41 billion in 2... もっと見る
英語原文をAIを使って翻訳しています。
SummaryAsia-Pacific Data Center Market AnalysisAccording to Mordor Intelligence, the Asia-Pacific data center market size is expected to grow from USD 35.77 billion in 2026 to USD 43.41 billion in 2027 and is forecast to reach USD 116.4 billion by 2032 at 21.8% CAGR over 2027-2032. This report is segmented by Data Center Size (Large, Medium, and more), Tier Type (Tier 3, Tier 1 and 2, and more), Data Center Type (Colocation, Hyperscale/Self-built, and more), End User (IT and ITES, Telecom, and more), and Geography (China, Japan, and more). The market forecasts are provided in terms of value (USD), based on availability. Asia-Pacific Data Center Market Trends and InsightsAccelerating roll-out of 5G core networksStandalone 5G rollouts create a facility opportunity through the computing infrastructure that supports mobile-network functions. GSMA Intelligence counted 17 standalone networks among 39 commercial 5G networks across 9 Asia-Pacific countries as of June 2025. Reliance Jio Infocomm confirmed commercial standalone 5G operation in India as of June 30, 2026. Malaysia's YTL Communications (Yes) launched a standalone service during the fourth quarter of 2025. NTT DOCOMO launched commercial 5G Core services in Japan in February 2026 using AWS alongside its on-premises network function virtualization infrastructure. Hybrid core deployment makes cloud hosting one part of the infrastructure opportunity, with the division of functions determining how much demand reaches hosted facilities. Rising hyperscale self-build investments by Chinese tech majorsComputing centers carrying ByteDance and JD.com branding show platform expansion turning into construction activity in Datong. Datong reported accelerated construction of the ByteDance-branded Volcano Cloud computing center Phase II during its 2025 plan-execution period. JD.com's intelligent computing center phases II and III were also under accelerated construction during that period. The same report said an upstream server-manufacturing project began construction and entered production in 2025. Concurrent center phases alongside server production connect the city's computing expansion with facilities and equipment supply, broadening the local development program beyond a single platform-branded site. Prolonged grid connection approval cyclesA development site cannot become usable data-center supply until its power connection supports operation. Japan's Agency for Natural Resources and Energy reported in October 2026 that connection periods for large loads, including data centers, had lengthened in some areas as grid headroom tightened. In 2025, NTT Global Data Centers' Japan and APAC executive estimated that developers in concentrated areas such as inner Tokyo might wait 5 to 10 years for power. Inner Tokyo illustrates the localized delivery risk, since the reported waits concern constrained areas rather than every Japanese site. Other drivers and restraints analyzed in the detailed report include:
For complete list of drivers and restraints, kindly check the Table Of Contents. Segment AnalysisLarge facilities accounted for a 30.4% share of the Asia-Pacific data center market size in 2026. SoftBank Corp. and its subsidiary IDC Frontier Inc. broke ground on a large-scale AI data center in Tomakomai, Japan, in April 2025. The expected opening scale was 50 MW for FY2026, and SoftBank's September 2026 transition plan retained that opening schedule. SoftBank's AI computing infrastructure and external users were the planned customers of the facility. Medium facilities are the fastest-growing segment, forecast at 23.3% CAGR over 2027-2032. In July 2025, Yunnan's state-assets authority reported that the Yunnan Communications Intelligent Computing Center, built by Yunnan Communications Investment Group, met the national medium data-center standard. The example links a medium-class facility with an intelligent-computing application, showing how a specialized workload can fit a project outside the largest size categories. At 100P of intelligent computing capacity, representing 10% of Yunnan's provincial intelligent computing capacity, this medium-standard center demonstrates meaningful regional scale within one facility. Tier 3 was the largest segment, with a 63.12% share of the regional market in 2026, and is the fastest-growing segment at a forecast 23.4% CAGR over 2027-2032. Yotta's national data center in Guwahati, India, was operating with 200 racks and a 2 MW IT load in February 2026. Yotta constructed and operated the Tier III facility on behalf of India's National Informatics Centre. Built-in scalability to double capacity gives the National Informatics Centre an expansion route within the commissioned site, linking further government computing requirements to an existing facility. The Tier 1 and 2 segment spans basic capacity in Tier 1 and redundant power and cooling components in Tier 2. Tier 1 requires preventive-maintenance shutdowns, while Tier 2 permits component removal without a shutdown but can be affected by unexpected shutdowns. Tier 4 uses independent, physically isolated redundant systems to protect IT operations against equipment or distribution-path failures. Unexpected shutdowns affect Tier 1 and 2 facilities, whereas Tier 4's protection becomes more vulnerable when a failure coincides with maintenance shutdown of its redundant systems. Complete Report Scope:
List of Companies Covered in this Report:
Additional Benefits:
Table of Contents1 INTRODUCTION1.1 Study Assumptions and Market Definition 1.2 Scope of the Study 2 RESEARCH METHODOLOGY 3 EXECUTIVE SUMMARY 4 MARKET LANDSCAPE 4.1 Market Overview 4.2 Market Drivers 4.2.1 Accelerating roll-out of 5G core networks 4.2.2 Rising hyperscale self-build investments by Chinese tech majors 4.2.3 Government tax-holiday incentives for green data centers 4.2.4 Surging AI/ML workload demand for on-prem GPU clusters 4.2.5 Rapid integration of submarine-cable landing stations with edge facilities 4.2.6 Build-to-suit models preferred by sovereign wealth funds 4.3 Market Restraints 4.3.1 Prolonged grid connection approval cycles 4.3.2 Pronounced water scarcity risk in Northern China 4.3.3 High real-estate cost inflation in tier-one Asia-Pacific cities 4.3.4 Shortage of certified data-center engineers 4.4 Industry Value Chain Analysis 4.5 Regulatory Landscape 4.6 Technological Outlook 4.7 Porter's Five Forces Analysis 4.7.1 Threat of New Entrants 4.7.2 Bargaining Power of Suppliers 4.7.3 Bargaining Power of Buyers 4.7.4 Threat of Substitutes 4.7.5 Competitive Rivalry 4.8 Market Outlook 4.8.1 IT Load Capacity 4.8.2 Raised Floor Space 4.8.3 Colocation Revenue 4.8.4 Installed Racks 4.8.5 Rack Space Utilization 4.8.6 Submarine Cable 4.9 Key Industry Trends 4.9.1 Smartphone Users 4.9.2 Data Traffic Per Smartphone 4.9.3 Mobile Data Speed 4.9.4 Broadband Data Speed 4.9.5 Fiber Connectivity Network 4.9.6 Regulatory Framework 4.9.6.1 China 4.9.6.2 Japan 4.9.6.3 India 4.9.6.4 Indonesia 4.9.6.5 Australia 4.9.6.6 Singapore 4.9.6.7 New Zealand 4.9.6.8 Malaysia 4.9.6.9 Thailand 4.9.6.10 Rest of Asia Pacific 5 MARKET SIZE AND GROWTH FORECASTS (VALUE) 5.1 By Data Center Size 5.1.1 Large 5.1.2 Massive 5.1.3 Medium 5.1.4 Mega 5.1.5 Small 5.2 By Tier Type 5.2.1 Tier 1 and 2 5.2.2 Tier 3 5.2.3 Tier 4 5.3 By Data Center Type 5.3.1 Hyperscale/Self-built 5.3.2 Enterprise/Edge 5.3.3 Colocation 5.3.3.1 Non-Utilized 5.3.3.2 Utilized 5.3.3.2.1 Retail Colocation 5.3.3.2.2 Wholesale Colocation 5.4 By End User 5.4.1 BFSI 5.4.2 IT and ITES 5.4.3 E-Commerce 5.4.4 Government 5.4.5 Manufacturing 5.4.6 Media and Entertainment 5.4.7 Telecom 5.4.8 Other End Users 5.5 By Geography 5.5.1 China 5.5.2 Japan 5.5.3 India 5.5.4 Indonesia 5.5.5 Australia 5.5.6 Singapore 5.5.7 New Zealand 5.5.8 Malaysia 5.5.9 Thailand 5.5.10 Rest of Asia Pacific 6 COMPETITIVE LANDSCAPE 6.1 Market Concentration 6.2 Strategic Moves 6.3 Market Share Analysis 6.4 Company Profiles (includes Global level Overview, Market level overview, Core Segments, Financials as available, Strategic Information, Market Rank/Share for key companies, Products and Services, and Recent Developments) 6.4.1 Amazon Web Services, Inc 6.4.2 Equinix, Inc. 6.4.3 Alibaba Cloud 6.4.4 Chindata Group Holdings Ltd 6.4.5 AirTrunk Operating Pty Ltd 6.4.6 Space DC Pte Ltd 6.4.7 NTT DATA, Inc. 6.4.8 Huawei Cloud Computing Technologies Co., Ltd 6.4.9 Global Data Solutions Co., Ltd. (GDS) 6.4.10 Google LLC 6.4.11 LG Uplus Corp 6.4.12 Range Technology Development Co., Ltd 6.4.13 NEXTDC Limited 6.4.14 Digital Realty Trust Inc. 6.4.15 Beijing VNET Broadband Data Center Co., Ltd 7 MARKET OPPORTUNITIES AND FUTURE OUTLOOK 7.1 White-Space and Unmet-Need Assessment
ご注文は、お電話またはWEBから承ります。お見積もりの作成もお気軽にご相談ください。本レポートと同分野(通信・IT)の最新刊レポート
Mordor Intelligence社の 技術・メディア・通信分野 での最新刊レポート
本レポートと同じKEY WORD(data center)の最新刊レポート
よくあるご質問Mordor Intelligence社はどのような調査会社ですか?Mordor Intelligenceは世界の多様な市場に関する重要動向、技術、競争、機会について調査しています。 もっと見る 調査レポートの納品までの日数はどの程度ですか?在庫のあるものは速納となりますが、平均的には 3-4日と見て下さい。
注文の手続きはどのようになっていますか?1)お客様からの御問い合わせをいただきます。
お支払方法の方法はどのようになっていますか?納品と同時にデータリソース社よりお客様へ請求書(必要に応じて納品書も)を発送いたします。
データリソース社はどのような会社ですか?当社は、世界各国の主要調査会社・レポート出版社と提携し、世界各国の市場調査レポートや技術動向レポートなどを日本国内の企業・公官庁及び教育研究機関に提供しております。
|
|