詳細検索

詳細検索

お問い合わせ

Asia-Pacific Data Center - Market Share Analysis, Industry Trends & Statistics, Growth Forecasts (2027 - 2032)

Asia-Pacific Data Center - Market Share Analysis, Industry Trends & Statistics, Growth Forecasts (2027 - 2032)


Asia-Pacific Data Center Market Analysis According to Mordor Intelligence, the Asia-Pacific data center market size is expected to grow from USD 35.77 billion in 2026 to USD 43.41 billion in 2... もっと見る

 

 

出版社
Mordor Intelligence
モードーインテリジェンス
出版年月
2026年10月22日
電子版価格
US$4,750
シングルユーザーライセンス
ライセンス・価格情報/注文方法はこちら
納期
3営業日以内
ページ数
262
言語
英語

英語原文をAIを使って翻訳しています。


 

Summary

Asia-Pacific Data Center Market Analysis

According to Mordor Intelligence, the Asia-Pacific data center market size is expected to grow from USD 35.77 billion in 2026 to USD 43.41 billion in 2027 and is forecast to reach USD 116.4 billion by 2032 at 21.8% CAGR over 2027-2032. This report is segmented by Data Center Size (Large, Medium, and more), Tier Type (Tier 3, Tier 1 and 2, and more), Data Center Type (Colocation, Hyperscale/Self-built, and more), End User (IT and ITES, Telecom, and more), and Geography (China, Japan, and more). The market forecasts are provided in terms of value (USD), based on availability.

Asia-Pacific Data Center Market Trends and Insights

Accelerating roll-out of 5G core networks

Standalone 5G rollouts create a facility opportunity through the computing infrastructure that supports mobile-network functions. GSMA Intelligence counted 17 standalone networks among 39 commercial 5G networks across 9 Asia-Pacific countries as of June 2025. Reliance Jio Infocomm confirmed commercial standalone 5G operation in India as of June 30, 2026. Malaysia's YTL Communications (Yes) launched a standalone service during the fourth quarter of 2025. NTT DOCOMO launched commercial 5G Core services in Japan in February 2026 using AWS alongside its on-premises network function virtualization infrastructure. Hybrid core deployment makes cloud hosting one part of the infrastructure opportunity, with the division of functions determining how much demand reaches hosted facilities.

Rising hyperscale self-build investments by Chinese tech majors

Computing centers carrying ByteDance and JD.com branding show platform expansion turning into construction activity in Datong. Datong reported accelerated construction of the ByteDance-branded Volcano Cloud computing center Phase II during its 2025 plan-execution period. JD.com's intelligent computing center phases II and III were also under accelerated construction during that period. The same report said an upstream server-manufacturing project began construction and entered production in 2025. Concurrent center phases alongside server production connect the city's computing expansion with facilities and equipment supply, broadening the local development program beyond a single platform-branded site.

Prolonged grid connection approval cycles

A development site cannot become usable data-center supply until its power connection supports operation. Japan's Agency for Natural Resources and Energy reported in October 2026 that connection periods for large loads, including data centers, had lengthened in some areas as grid headroom tightened. In 2025, NTT Global Data Centers' Japan and APAC executive estimated that developers in concentrated areas such as inner Tokyo might wait 5 to 10 years for power. Inner Tokyo illustrates the localized delivery risk, since the reported waits concern constrained areas rather than every Japanese site.

Other drivers and restraints analyzed in the detailed report include:

  1. Government tax-holiday incentives for green data centers
  2. Surging AI/ML workload demand for on-prem GPU clusters
  3. Pronounced water scarcity risk in Northern China

For complete list of drivers and restraints, kindly check the Table Of Contents.

Segment Analysis

Large facilities accounted for a 30.4% share of the Asia-Pacific data center market size in 2026. SoftBank Corp. and its subsidiary IDC Frontier Inc. broke ground on a large-scale AI data center in Tomakomai, Japan, in April 2025. The expected opening scale was 50 MW for FY2026, and SoftBank's September 2026 transition plan retained that opening schedule. SoftBank's AI computing infrastructure and external users were the planned customers of the facility.

Medium facilities are the fastest-growing segment, forecast at 23.3% CAGR over 2027-2032. In July 2025, Yunnan's state-assets authority reported that the Yunnan Communications Intelligent Computing Center, built by Yunnan Communications Investment Group, met the national medium data-center standard. The example links a medium-class facility with an intelligent-computing application, showing how a specialized workload can fit a project outside the largest size categories. At 100P of intelligent computing capacity, representing 10% of Yunnan's provincial intelligent computing capacity, this medium-standard center demonstrates meaningful regional scale within one facility.

Tier 3 was the largest segment, with a 63.12% share of the regional market in 2026, and is the fastest-growing segment at a forecast 23.4% CAGR over 2027-2032. Yotta's national data center in Guwahati, India, was operating with 200 racks and a 2 MW IT load in February 2026. Yotta constructed and operated the Tier III facility on behalf of India's National Informatics Centre. Built-in scalability to double capacity gives the National Informatics Centre an expansion route within the commissioned site, linking further government computing requirements to an existing facility.

The Tier 1 and 2 segment spans basic capacity in Tier 1 and redundant power and cooling components in Tier 2. Tier 1 requires preventive-maintenance shutdowns, while Tier 2 permits component removal without a shutdown but can be affected by unexpected shutdowns. Tier 4 uses independent, physically isolated redundant systems to protect IT operations against equipment or distribution-path failures. Unexpected shutdowns affect Tier 1 and 2 facilities, whereas Tier 4's protection becomes more vulnerable when a failure coincides with maintenance shutdown of its redundant systems.

Complete Report Scope:

  • By Data Center Size
    • Large
    • Massive
    • Medium
    • Mega
    • Small
  • By Tier Type
    • Tier 1 and 2
    • Tier 3
    • Tier 4
  • By Data Center Type
    • Hyperscale/Self-built
    • Enterprise/Edge
    • Colocation
      • Non-Utilized
      • Utilized
        • Retail Colocation
        • Wholesale Colocation
  • By End User
    • BFSI
    • IT and ITES
    • E-Commerce
    • Government
    • Manufacturing
    • Media and Entertainment
    • Telecom
    • Other End Users
  • By Geography
    • China
    • Japan
    • India
    • Indonesia
    • Australia
    • Singapore
    • New Zealand
    • Malaysia
    • Thailand
    • Rest of Asia Pacific

List of Companies Covered in this Report:

  1. Amazon Web Services, Inc
  2. Equinix, Inc.
  3. Alibaba Cloud
  4. Chindata Group Holdings Ltd
  5. AirTrunk Operating Pty Ltd
  6. Space DC Pte Ltd
  7. NTT DATA, Inc.
  8. Huawei Cloud Computing Technologies Co., Ltd
  9. Global Data Solutions Co., Ltd. (GDS)
  10. Google LLC
  11. LG Uplus Corp
  12. Range Technology Development Co., Ltd
  13. NEXTDC Limited
  14. Digital Realty Trust Inc.
  15. Beijing VNET Broadband Data Center Co., Ltd

Additional Benefits:

  • The market estimate (ME) sheet in Excel format
  • 3 months of analyst support


ページTOPに戻る


Table of Contents

1 INTRODUCTION
1.1 Study Assumptions and Market Definition
1.2 Scope of the Study

2 RESEARCH METHODOLOGY

3 EXECUTIVE SUMMARY

4 MARKET LANDSCAPE
4.1 Market Overview
4.2 Market Drivers
4.2.1 Accelerating roll-out of 5G core networks
4.2.2 Rising hyperscale self-build investments by Chinese tech majors
4.2.3 Government tax-holiday incentives for green data centers
4.2.4 Surging AI/ML workload demand for on-prem GPU clusters
4.2.5 Rapid integration of submarine-cable landing stations with edge facilities
4.2.6 Build-to-suit models preferred by sovereign wealth funds
4.3 Market Restraints
4.3.1 Prolonged grid connection approval cycles
4.3.2 Pronounced water scarcity risk in Northern China
4.3.3 High real-estate cost inflation in tier-one Asia-Pacific cities
4.3.4 Shortage of certified data-center engineers
4.4 Industry Value Chain Analysis
4.5 Regulatory Landscape
4.6 Technological Outlook
4.7 Porter's Five Forces Analysis
4.7.1 Threat of New Entrants
4.7.2 Bargaining Power of Suppliers
4.7.3 Bargaining Power of Buyers
4.7.4 Threat of Substitutes
4.7.5 Competitive Rivalry
4.8 Market Outlook
4.8.1 IT Load Capacity
4.8.2 Raised Floor Space
4.8.3 Colocation Revenue
4.8.4 Installed Racks
4.8.5 Rack Space Utilization
4.8.6 Submarine Cable
4.9 Key Industry Trends
4.9.1 Smartphone Users
4.9.2 Data Traffic Per Smartphone
4.9.3 Mobile Data Speed
4.9.4 Broadband Data Speed
4.9.5 Fiber Connectivity Network
4.9.6 Regulatory Framework
4.9.6.1 China
4.9.6.2 Japan
4.9.6.3 India
4.9.6.4 Indonesia
4.9.6.5 Australia
4.9.6.6 Singapore
4.9.6.7 New Zealand
4.9.6.8 Malaysia
4.9.6.9 Thailand
4.9.6.10 Rest of Asia Pacific

5 MARKET SIZE AND GROWTH FORECASTS (VALUE)
5.1 By Data Center Size
5.1.1 Large
5.1.2 Massive
5.1.3 Medium
5.1.4 Mega
5.1.5 Small
5.2 By Tier Type
5.2.1 Tier 1 and 2
5.2.2 Tier 3
5.2.3 Tier 4
5.3 By Data Center Type
5.3.1 Hyperscale/Self-built
5.3.2 Enterprise/Edge
5.3.3 Colocation
5.3.3.1 Non-Utilized
5.3.3.2 Utilized
5.3.3.2.1 Retail Colocation
5.3.3.2.2 Wholesale Colocation
5.4 By End User
5.4.1 BFSI
5.4.2 IT and ITES
5.4.3 E-Commerce
5.4.4 Government
5.4.5 Manufacturing
5.4.6 Media and Entertainment
5.4.7 Telecom
5.4.8 Other End Users
5.5 By Geography
5.5.1 China
5.5.2 Japan
5.5.3 India
5.5.4 Indonesia
5.5.5 Australia
5.5.6 Singapore
5.5.7 New Zealand
5.5.8 Malaysia
5.5.9 Thailand
5.5.10 Rest of Asia Pacific

6 COMPETITIVE LANDSCAPE
6.1 Market Concentration
6.2 Strategic Moves
6.3 Market Share Analysis
6.4 Company Profiles (includes Global level Overview, Market level overview, Core Segments, Financials as available, Strategic Information, Market Rank/Share for key companies, Products and Services, and Recent Developments)
6.4.1 Amazon Web Services, Inc
6.4.2 Equinix, Inc.
6.4.3 Alibaba Cloud
6.4.4 Chindata Group Holdings Ltd
6.4.5 AirTrunk Operating Pty Ltd
6.4.6 Space DC Pte Ltd
6.4.7 NTT DATA, Inc.
6.4.8 Huawei Cloud Computing Technologies Co., Ltd
6.4.9 Global Data Solutions Co., Ltd. (GDS)
6.4.10 Google LLC
6.4.11 LG Uplus Corp
6.4.12 Range Technology Development Co., Ltd
6.4.13 NEXTDC Limited
6.4.14 Digital Realty Trust Inc.
6.4.15 Beijing VNET Broadband Data Center Co., Ltd

7 MARKET OPPORTUNITIES AND FUTURE OUTLOOK
7.1 White-Space and Unmet-Need Assessment

 

ページTOPに戻る

ご注文は、お電話またはWEBから承ります。お見積もりの作成もお気軽にご相談ください。

webからのご注文・お問合せはこちらのフォームから承ります

本レポートと同じKEY WORD(data center)の最新刊レポート


よくあるご質問


Mordor Intelligence社はどのような調査会社ですか?


Mordor Intelligenceは世界の多様な市場に関する重要動向、技術、競争、機会について調査しています。 もっと見る


調査レポートの納品までの日数はどの程度ですか?


在庫のあるものは速納となりますが、平均的には 3-4日と見て下さい。
但し、一部の調査レポートでは、発注を受けた段階で内容更新をして納品をする場合もあります。
発注をする前のお問合せをお願いします。


注文の手続きはどのようになっていますか?


1)お客様からの御問い合わせをいただきます。
2)見積書やサンプルの提示をいたします。
3)お客様指定、もしくは弊社の発注書をメール添付にて発送してください。
4)データリソース社からレポート発行元の調査会社へ納品手配します。
5) 調査会社からお客様へ納品されます。最近は、pdfにてのメール納品が大半です。


お支払方法の方法はどのようになっていますか?


納品と同時にデータリソース社よりお客様へ請求書(必要に応じて納品書も)を発送いたします。
お客様よりデータリソース社へ(通常は円払い)の御振り込みをお願いします。
請求書は、納品日の日付で発行しますので、翌月最終営業日までの当社指定口座への振込みをお願いします。振込み手数料は御社負担にてお願いします。
お客様の御支払い条件が60日以上の場合は御相談ください。
尚、初めてのお取引先や個人の場合、前払いをお願いすることもあります。ご了承のほど、お願いします。


データリソース社はどのような会社ですか?


当社は、世界各国の主要調査会社・レポート出版社と提携し、世界各国の市場調査レポートや技術動向レポートなどを日本国内の企業・公官庁及び教育研究機関に提供しております。
世界各国の「市場・技術・法規制などの」実情を調査・収集される時には、データリソース社にご相談ください。
お客様の御要望にあったデータや情報を抽出する為のレポート紹介や調査のアドバイスも致します。


詳細検索

このレポートへのお問合せ

03-3582-2531

電話お問合せもお気軽に

 

 

2026/11/17 10:26

160.48 円

176.90 円

214.31 円

ページTOPに戻る